Preliminary Design and Feasibility study | Tram network for Khartoum
taking the project to next stage
45% discount
Easy Payment , Electronic and Hard Copies
Live Project : Transport Network Sudan
-
Intro
-
Project Brief
-
Regional Insight
-
Prefeasibility Study
-
Workflow
-
Funding
What is LRT?
Project Brief
This overview is essential for those interested in Sudan’s transit systems, city planning, and sustainable development.
-
Client: Ministry of Infrastructure and Urban Planning – Khartoum, Sudan
-
Project: Tram Network – 3 lines totaling 33 km (7 km + 11 km + 15 km)
-
Study Scope: Feasibility Study, Preliminary Design, ESIA, Stakeholder Engagement
-
Estimated Duration: 12–18 months
Project Background
Region, Main Exports, Geographic Location, Populations, Land Area
Prefeasibility Report – Khartoum Tram Network
Background Work
Contains Information on :
- Survey Data maps
- Traffic Analysis Zones
- Vehicle Data
- Journey Plans and lengths of trips
- Schematic Diagram of Proposed Networks
Click Here : Prefeasibility Report- Tram Network Khartoum
Workflow

1.0 Deliverables
Electronic and Hard Submittals
1.1 All soft copies of drawings should be in CAD format and in PDF format.
1.2 The Consultant shall provide the Employer with a soft copy of the drawings in GIS compatible format.
1.3 An Electronic version that can be printed on A3 size
1.4 An Electronic version that can be printed at A0 size
2.1 Each submittal shall be in both hard and editable soft copy.
2.2 The draft submittals of any reports including the schematic design report and the close out report should be submitted in 3 colored copies on A3 size.
2.3 The final submittal of any reports including the schematic design report and the close out report should be submitted in 5 coloured copies on A3 size and 2 colored copies on A4 size. All shall be with adequate presentable hardcover and editable soft copy.
2.0 Schedule Renumeration
For full Renumeration Details :
Enter Ministry Portal
3.0 Key, Submittals, Timeline & Costs

4.0 Payment
First Advanced Payment of 6,995 Euro

7.5% Advanced Payment
Remaining to be paid in accordance to Remuneration Schedule
Payments to be made in EUROS (€) to the following bank account :
PAYMENT INFORMATION :
(a) BANK :
QATAR NATIONAL BANK
(b) IBAN :
QA42QNBA 00000000 7330002388003
(c) SWIFT CODE :
QQNB AQA QA XXX
(d) NAME :
KISCONSULT, LTD CO
EXPECTED OUTCOMES

(a) Feasibility Report
(b) Preliminary Design Drawings
(c) Funding / Donor appraisal-ready documentation for PPP
(d) Recommendation for Implementation
- Proposed Funding Sources : Application to AfDB
- The Consultant shall be responsible for and bear the cost of obtaining the visas and other permits needed by the Consultant’s personnel.
Reliable Guarantee for Total Satisfaction
The Employer shall without charge furnish to the Consultant upon written request the information, data, drawings and documents described below in soft copy format;

(a) Khartoum Master Plan drawing in CAD format
(b) Khartoum topography
(c) Developer Design Guidelines
(d) Feasibility study of line A (1)
(e) Light Rail Tram Design Guidelines
(f) Applicable international codes, standards and data
(g) Applicable local codes
This section clarifies our guarantee policy, highlighting our submittals process designed to ensure your peace of mind and satisfaction.
The Consultant shall be responsible for and bear the cost of obtaining the visas and other permits needed by the Consultant’s personnel.
PURCHASE ONLINE
45% Discount for Online Payment